CSCEC rises to 18th on Fortune Global 500 list (II)

0 Comment(s)Print E-mail China.org.cn, August 11, 2020
Adjust font size:

Read Part (I) 

Real estate development and investment

CSCEC owns two real estate brands - China Overseas Land & Investment Ltd. (COLI) and China State Construction Land (CSC LAND). COLI is the brand name of the real estate business sector of China Overseas Holdings Limited (COHL) It has ranked first in terms of brand value among Chinese property enterprises for many years. The brand has developed property development business in dozens of economically active cities in the Guang dong-Hong Kong-Macao Greater Bay Area, the Yangtze River Delta and the Beijing-Tianjin-Hebei Region in China, forming a balanced and robust business layout across the country. The Company leverages the comprehensive advantages of its subsidiaries in investment and construction to make the effective synergy of property development and other businesses such as engineering construction, infrastructure investment, and urban and rural construction. Moreover, the Company steps up efforts to develop business in areas where the headquarters of subsidiaries are located and areas where CSCEC has traditional advantages and improves product design, development and service quality. All these endeavors manifest the brand effect of CSCEC property brands and gradually foster strong competitiveness in the industrial chain.

Survey and Design

The survey and design sector of CSCEC is mainly composed of seven large-scale survey and design enterprises with Grade-A design qualifications, which covers businesses in areas such as construction design, urban planning, engineering survey and municipal public engineering design, and ranks top in China in areas such as super high-rise buildings, airports, hotels, sports architecture, exhibition buildings and ancient buildings. The Company has nearly 10,000 professional and technical personnel in the fields of construction engineering design, municipal engineering design, engineering survey and rock-soil, with the total number of high-end professionals ranking top in the industry. The Company has made important contributions to the development of the industry in terms of design originality, technological innovation and standardization.

Overseas Operation

CSCEC is the earliest industry brand in China to carry out the international engineering contracting business.Adhering to the operation philosophy of "internationalization", CSCEC has formed a relatively rational overseas market layout through decades of overseas market development and operation. The overseas engineering contracting businesses of CSCEC cover various areas such as housing construction, manufacturing,energy, transportation, water engineering, industry, petrochemical, handling of hazardous materials,telecommunications, sewage/waste treatment, etc. CSCEC has explored and successfully carried out overseas property development. In terms of project operation, apart from the traditional mode of general contracting,the Company has also actively explored project operation modes such as general contracting driven by financing and investment, DB, EPC, BOT and PPP. Meanwhile, the Company has actively promoted capital operation ways such as merger and acquisition, striving to realize substantial leapfrog development of overseas core business. The Company will continue to promote the strategy of "overseas development", enhance the localized operation and resource integration, implement the Belt and Road Initiative, and explore overseas development to advance international operation with a stronger sense of mission, more ambitious target and higher positioning. 

Construction, Operation & Maintenance of Huoshenshan Hospital and Leishenshan Hospital

Several days before the Spring Festival, the COVID-19 pandemic broke out. On January 23, 2020, requested by Hubei Province and Wuhan City, China Construction Third Engineering Bureau CO., LTD undertook the construction of Huoshenshan Hospital,which was designated to receive coronavirus patients. Two days later, China Construction Third Engineering Bureau CO., LTD was assigned to independently build the Leishenshan Hospital. The company was confronted with high construction standards, a short construction period, great pressure of on-site safety and pandemic prevention, lack of migrant workers during the Spring Festival Holiday, factory shutdown, and obstacles that arose during the lockdown of Wuhan such as personnel allocation,materials procurement and equipment dispatch, etc.

To help the company accomplish the two major projects, Zhou Naixiang, Chairman of China State Construction, Chairman of CSCEC, and Zheng Xuexuan, General Manager of China State Construction, Director and President of CSCEC, hurried Wuhan in time for frontline command and field guidance. CSCEC paid great attention to the deployment and assigned over 4,000 employees from 11 affiliated companies to support the construction of the two hospital projects, including China Construction First Group Corporation Limited, China Construction Second Engineering Bureau Ltd., China Construction Fourth Engineering Bureau CO., LTD, China Construction Fifth Engineering Division Corp.,Ltd. (CCFEB), China Construction Seventh Engineering Division Corp., Ltd., China Construction Eighth Engineering Division Corp., Ltd. (CCEED), China State Decoration Group Co., Ltd.,China Construction Science and Industry Corporation Ltd., China Construction Industrial & Energy Engineering Group Co., Ltd.(CCIEE), China West Construction Group Co., Ltd., and China Construction Science & Technology Co., Ltd.

As the major construction unit of the two hospitals, China Construction Third Engineering Bureau CO., Ltd. established a leading group for the emergency project construction immediately after being assigned the projects, formulated the hourly works schedule, and organized work shifts on an hourly base, realizing simultaneous planning and design, plan compilation, on-site construction and resource allocation. The company organized nine subsidiaries to support the projects and allocated over 2,500 sets of large-scale equipment and transportation vehicles, over 5,000shipping containers, and over 4,000 management personnel and about 35,000 operational personnel to ensure 24-hour construction.The BIM technology and the prefabricated construction technology were adopted to ensure safe and highly efficient construction. In the end, the construction of the Huoshenshan Hospital was completed within 10 days and nights while the construction of the Leishenshan Hospital was completed within 12 days.

The construction progress of the Huoshenshan Hospital and the Leishenshan Hospital was paid great attention to by the country and even the whole world. With the 5G signal, mainstream media such as CCTV and People's Daily broadcast the 24-hour construction scenes. Nearly 100 million people watched the live broadcast at the highest point. The live broadcast and news reports of CSCEC also received tens of millions of views. 

Read Part (III)

Follow China.org.cn on Twitter and Facebook to join the conversation.
ChinaNews App Download
Print E-mail Bookmark and Share

Go to Forum >>0 Comment(s)

No comments.

Add your comments...

  • User Name Required
  • Your Comment
  • Enter the words you see:   
    Racist, abusive and off-topic comments may be removed by the moderator.
Send your storiesGet more from China.org.cnMobileRSSNewsletter