HARBIN, Dec. 2 (Xinhua) -- The China-Russia east-route natural gas pipeline was put into operation on Monday.
The pipeline began providing China with Russian natural gas, scheduled to reach 5 billion cubic meters in 2020 and increase to 38 billion cubic meters of natural gas annually from 2024, under a 30-year contract signed between the China National Petroleum Corp (CNPC) and Russian gas giant Gazprom in May 2014.
The cross-border gas pipeline has a 3,000-km section in Russia and a 5,111-km stretch in China. Enditem
Go to Forum >>0 Comment(s)