0 Comment(s)
Print
E-mail CRI, February 3, 2017|
Maintenance and inspection procedures fall into two categories: one with high-voltage power on and the other one with power unplugged. The body of each train needs to be cleaned and all high-voltage equipment needs to be checked. Each inspector wears a body camera to record the whole inspection process. [Photo: Xinhua] |

Go to Forum >>0 Comment(s)